This project gave a school much-needed extra classroom space using converted shipping containers. The school, an existing client, approached us to deliver a fast and cost-effective modular solution instead of traditional brick construction.
The containers were installed onto new foundations before being cut and joined together to create larger teaching spaces. Structural steelwork was added where needed, with steel beams spanning the roof to ensure column-free open interiors.
Insulation was installed externally on walls and ceilings, with spray foam underneath. Full internal boarding and a high-spec fit-out followed, including lighting, electrics, and air conditioning.
One of the units was designed as a dedicated drama room, finished in black with a built-in stage area. Externally, the containers were clad in vertical red cedar to blend naturally with the school environment. Access ramps and walkways were also installed.
We worked closely with the local planning authority and Building Control throughout to achieve full approval. The project was completed at nearly 40% lower cost than traditional brick classrooms, with a significantly shorter build time, while delivering a premium, polished finish both inside and out.
The school was extremely happy with the final result and the additional flexible teaching spaces created.