We provide office partitions, office refurbishment, mezzanine floors and more. Get a free quote today.

  • Unit 4, Spring Valley Business Centre,

    Porters Wood, St Albans, Hertfordshire, AL3 6PD

  • 01727 826 655

    Mon - Friday: 9.00 to 18.00

  • sales@imageinteriorsystems.co.uk

    Get a Free Quote

Mezzanine Floor Suppliers Hertfordshire

Image Interior Systems is a mezzanine floor company in Herts. We are mezzanine floor suppliers in Hertfordshire and mezzanine floor installers Hertfordshire businesses use for design, supply and installation, working across Herts, London and the South East. With over 15 years of experience, we create additional usable floor space within existing industrial, commercial, and warehouse buildings — helping businesses grow without the high costs and disruption of relocating or extending their premises.

Our turnkey mezzanine solutions cover every aspect of the project, from initial site survey and structural design through to full Building Control submission, fire protection, and complete fit-out. Whether you need a simple storage mezzanine, a multi-level office environment, or a complex production platform with integrated machinery support, we deliver fully compliant, engineered solutions tailored to your specific loading, access, and fire safety requirements.

Drop Us a Line

Send Your Message
  • Should be Empty:
  • Pattern Bg
    Mezzanine Flooring

    Double your space with our

    Mezzanine Floor Contractors Hertfordshire

    Mezzanines can optimise your existing or new space to help fulfil all the requirements your business operations might need. Over the last decade Mezzanine floors are seen as a way to both optimise existing and new space with rising rents and scarce warehouse facilities. Additionally, the rise in online shopping has created a large requirement for mezzanine flooring.

    Whether for Storage, Office or Production we can provide mezzanine floor installation from simple storage solutions all the way to complex low deflection floors built for robotics operated production lines. Through the years we have built small mezzanines from 50 sqm all the way to larger multi-tiered mezzanines of over 1000 sqm.

    Click here to see our complete list of options. Or click here to see our FAQs.

    View one of our recently completed Mezzanine Floor installations below:

    More about our

    Mezzanine Flooring

    One of the key factors when considering a mezzanine is to clearly understand how you intend to use the mezzanine floor. This will the dictate the loading and deflection levels needed and whether fire rating is required. We also need to assess your space to plan escape routes from the mezzanine floor, to ensure your concrete slab can take the loading required and advise if any oversize base plates are needed. Once we have assessed your space and your requirements we will produce CAD drawings and structural calculations for the mezzanine floor.

    Sometimes installation is intricate due to existing and expensive ground level machinery, rest assured we always comprehensively project manage the installation complexities to protect your machinery, employees and operations. Our mezzanine floors are designed around ground floor fixtures and work areas to maximise the vertical space.

    As you would expect as well as installing the mezzanine floor we fully project manage your mezzanine build and therefore take care of all additional elements including creating access through existing walls from elsewhere in the building, building any stud walls or jumbo stud walls on top or beneath your new mezzanine.

    The following accessories are available and we can discuss what is required on your project.

    • DDA compliant staircases and landings
    • Hand and knee rail with integral kick board
    • Cat ladders
    • Roll over Pallet Gates, Dock Loading Gates
    • Loading plates
    • Fire rated ceilings & column cladding, fire rated fascia
    • Under mezzanine and above floor Lighting
    • Fire Alarms

    Each installation comes with Building Regulations Approval pre-agreed with the client.

    In addition to the new mezzanines we install we also dismantle mezzanines that are required to be removed and thus where availability allows we can build mezzanines from used steels as well as new.

    Contact us today for a quick quote for your mezzanine floor project.

    Get a quote


    Case Studies

    Recent Mezzanine Flooring Installations in Hertfordshire

    Mezzanine Floor St Albans

    Mezzanine Floor St Albans

    Our client located in St Albans got in contact requesting an additional Mezzanine floor, (additional to the one we installed in 2018 for storage and office use), the size of the new mezzanine was 145sqm.
    Mezzanine Floor London

    Mezzanine Floor London

    Our client on this project is a multi-national with Headquarters in London and with over 200 laboratories worldwide.
    Mezzanine Floor - Welwyn

    Mezzanine Floor - Welwyn

    Our client Headquartered in Germany needed to create a new small training room to demonstrate their products to the UK market. In order to do this they needed to install a mezzanine to create the space.

    Across Hertfordshire

    Mezzanine floors by town

    The pages below are for businesses searching in a specific town. Completed mezzanine jobs stay as case studies and are linked from the town page, rather than being copied onto it.

    Watford · Stevenage · Hemel Hempstead · Hitchin · Hatfield · Hertford · Bishop's Stortford

    Case studies: St Albans and Welwyn.

    Image Gallery

    Mezzanine Flooring

    Mezzanine Floor & Fit-Out FAQs

    Looking to add extra space with a mezzanine floor or complete office fit-out?
    Below you’ll find answers to the most common questions customers ask when planning a mezzanine installation — from permissions and fire safety to costs and timelines.

    Do I need planning permission for a mezzanine floor?

    In most cases, planning permission is not required if your mezzanine is built inside an existing building and does not alter the external appearance or use of the premises. Typically, planning starts to become a factor at 200m² floors and above. However, Building Regulations approval is always required, covering structure, fire protection, and safety.

    If your mezzanine changes the building’s use class or adds significant floor area, your provider can liaise with your local authority as part of a Image Interior Systems turnkey mezzanine fit-out service.

    What approvals are required for a mezzanine installation?

    All mezzanine floors must comply with UK Building Regulations, which typically cover:

    • Structural design and loading
    • Fire safety and escape routes
    • Access and guarding
    • Lighting, ventilation, and electrics

    Image Interior Systems will produce structural calculations, layout drawings, and submit Building Control documentation on your behalf.

    Will my mezzanine floor need fire protection?

    Yes, in most cases. Fire protection requirements depend on the use, size, and occupancy of the mezzanine. If the mezzanine is used for offices, production, or if people work below it, then fire-rated protection is usually mandatory.

    Typical systems include:

    • Suspended 1-hour fire-rated ceilings
    • Column casings and fascia boards
    • Fire detection in new rooms and possibly sprinkler systems

    Your supplier will design and install these features to achieve 30–60 minutes of fire resistance, ensuring full Building Control compliance.

    How much load can a mezzanine floor support?

    The load-bearing capacity of a mezzanine is determined by its use:

    Type of Use Typical Load Rating (kN/m²)
    Office / Light Use 3.5 – 4.0
    Medium Storage 4.8 – 7.2
    Heavy Duty / Racking 9.6+

    Your mezzanine floor will be engineered to suit your operational requirements and backed by structural calculations and design certification.

    What’s included in our turnkey mezzanine and fit-out service?

    A turnkey service covers every stage of your project, from concept to completion. It typically includes:

    • Site survey and CAD design
    • Structural calculations and Building Control management
    • Fabrication and installation (steelwork, decking, stairs, handrails)
    • Fit-out works such as ceilings, partitions, lighting, power, HVAC, fire protection, flooring, decoration, and furniture

    This means one point of contact, a single contract, and a smoother handover.

    How long does a mezzanine installation take?

    A standard mezzanine has a lead time of 4-5 weeks from drawing sign-off, but installation on projects over 200sqm will be installed on site in 1 week or less. If your project includes a full office fit-out, the timeline on site may extend to an additional 4–6 weeks install time on site.

    We can offer phased works or out-of-hours installation to reduce business disruption where feasible.

    Do I need to do any preparation prior to installation, is there anything you require from me?

    You will need to provide any information that exists on the slab loading of the mezzanine floor area, this can be obtained from the landlord or agent, we can advise what is needed if you cannot obtain.

    We also need clear access to the mezzanine area.

    Can operations continue whilst you are installing the mezzanine?

    With a coordinated sensible and safe approach we can mitigate downtime to your operations. Our safety procedures will be outlined in our CDM, working under safety regulations and issues will be identified in our RAMS.

    Can you integrate lighting, sprinklers, and HVAC with a mezzanine?

    Yes — we undertake all aspects of the fit-out coordinating mechanical and electrical (M&E) design with the mezzanine structure to ensure compliance and functionality. This can include:

    • LED lighting and emergency lighting with fire hoods
    • Power and data trunking
    • Fire alarms and sprinklers
    • Heating, ventilation, and air conditioning (HVAC)

    Integration ensures all systems meet Building Regulations and fire safety standards.

    Does a mezzanine count as an extra storey?

    A mezzanine is only classed as an additional storey if it covers 50% or more of the area of the largest floor in the building. This can affect fire safety, access, and planning requirements, so it’s important to confirm during the design stage.

    Keywords: mezzanine storey rules, mezzanine regulations UK, mezzanine area limit

    What are the stair and edge protection requirements?

    Every mezzanine must include:

    • Compliant staircases (correct rise and going dimensions)
    • Non-slip nosings and continuous handrails
    • Edge protection or balustrades on exposed sides
    • Escape stairs where required for fire safety

    All designs are compliant with Approved Documents K & B of the Building Regulations.

    Is installing a mezzanine cheaper than moving premises or extending?

    Yes — installing a mezzanine floor is often 50–80% cheaper than relocating or extending your building. You gain extra usable floor space without increasing rent or rates, and installation is usually completed in a matter of weeks. Most mezzanines are modular and demountable, meaning they can be relocated or expanded as your business grows.

    What types of mezzanine floors are available?

    There are several mezzanine options depending on your needs:

    • Office mezzanines – with partitions, glazing, lighting, and decoration
    • Storage mezzanines – for racking, shelving, or warehousing
    • Retail mezzanines – for display or customer access areas
    • Production mezzanines – integrated with machinery or conveyors

    Each type is custom-designed to meet your load, fire, and acoustic performance requirements.